Crucial weekend:
Snow drifting in trucks, almost flipped a truck, got stranded in the woods, drove to Harrisonburg via Tabor, Macrock, jaboi lifestyle, keystone, cracker barrell #rare #crispy #diarrheaplanet
One day..
Cleansing.
VT Engineering rules.
The Signature Engineering Building on 18 January 2013, a day after the first year’s winterstorm gave Blacksburg and the Virginia Tech campus 6 inches of snow. The SEB is expected to be open this time next year, in 2014. Its progress can be followed here, live, at our webcam from atop Whittemore Hall: http://www.eng.vt.edu/signaturebuilding/livecam
An anonymous donor committed $25 million toward the Signature Engineering Building currently under construction at Virginia Tech.
The largest single donation ever given to the 140-year-old institution was one of three multimillion-dollar contributions to Virginia Tech’s College of Engineering highlighted April 28, 2011 by university President Charles W. Steger.
Erik Engstrom / Earth Tour
I watched the first DVD of Earth Tour today, I should go finish it again.